It's a frenzy to find power:
www.tomshardware.com
OpenAI has a huge project in Texas, as part of the Stargate project.
Nothing like strapping 30 jet engines together to keep things humming along. I'd hate to be living in a neighborhood next to that.
All ran on diesel or gas delivered by truck.
Faced with multi-year delays to secure grid power, US data center operators are deploying aeroderivative gas turbines — effectively retired commercial aircraft engines bolted into trailers — to keep AI infrastructure online.
Data centers turn to commercial aircraft jet engines bolted onto trailers as AI power crunch bites — cast-off turbines generate up to 48 MW of electricity apiece
With AI buildouts outpacing the grid, data centers are rolling in jet-powered turbines to keep their clusters online.
OpenAI has a huge project in Texas, as part of the Stargate project.
Nothing like strapping 30 jet engines together to keep things humming along. I'd hate to be living in a neighborhood next to that.
All ran on diesel or gas delivered by truck.